Project : Apartment Building | Hanover

Construction Management Work Commissioned in: May 2021

Address : 223, 10th Street, Hanover, Ontario

Amenities : 7-storey apartment building with an underground parking garage

Construction Manager: n Construction Inc.

Architect: n Architecture Inc.

Civil Engineer: n Engineering Inc.

Structural Engineer: KO & Partners

MEP Engineer: Jain Sustainability Consultants Inc.


n Construction Inc. was commissioned in 2021 to provide construction management services for the proposed apartment building in Hanover, Ontario. The proposed development is a 7-storey apartment building with a gross floor area of 117,511.11 ft2 with 109 residential units. There is one level of underground parking, in addition to surface level parking. The development includes amenities such as; offices and meeting rooms, gym and yoga area with lockers, a party room, and a roof top patio with a barbecue area.

The building exterior has a mixture of modern/contemporary and traditional design with stone veneer wrapped around the ground floor, while pertaining a modern look of aluminum composite panels (ACP) with red and beige brick finishes, being in harmony with the local style of Architecture. For the focus on framing the amazing views, large picture windows are arranged as a sequence to capture the grand moments of the town. The framed views were determined from the interior spaces of the units as a way of bringing the city into the residences without exposing its occupants.

Upon receiving the project, a lot of time was spent on value engineering to make the construction cost effective with the rising material cost since the global pandemic. n Construction Inc. maintained the design and quality of the project while endeavouring to reduce the overall construction cost.

On September 21st, 2022, the owners of the building, including the construction management team and the local officials held a groundbreaking ceremony to celebrate the start of construction of this new building. This symbolic gesture with gold colour painted shovels brought together the project stakeholders, city staff, consultants, contractors, sub-contractors and the community to celebrate both this milestone and the development entailing the Town of Hanover.

Construction began on October 11, 2022. So far, excavation and shoring of the new building have been completed. The mud slab and raft slabs are currently being done in 4 quadrants. The first and the second quadrant are completed and the third quadrant is being prepared. As of August 2023, the assembly of steel reinforcement of the columns are being completed throughout, and concrete columns are being formed. The crane has also been installed on site.

It has been a challenging but rewarding process and we are excited to see the next steps.